§ 2.52.040. General requirements—Adoption by reference.  


Latest version.
  • This section contains the basic requirements that apply to the SEPA process. The city adopts the following sections of Chapter 197-11 of the Washington Administrative Code by reference:

    WAC 197-11-040 Definitions
    050 Lead agency
    055 Timing of the SEPA process
    060 Content of environmental review
    070 Limitations on actions during SEPA process
    080 Incomplete or unavailable information
    090 Supporting documents
    100 Information required of applicants
    158 GMA project review—reliance on existing plans, laws and regulations
    164 Planned actions—definitions and criteria
    WAC 197-11-168 Ordinances or resolutions designating planned actions—procedures for adoption
    172 Planned actions—project review
    210 SEPA/GMA integration
    220 SEPA/GMA definitions
    228 Overall SEPA/GMA integration procedures
    230 Timing of an integrated SEPA/GMA process
    232 SEPA/GMA integration procedures for preliminary planning, environmental analysis, and expanded scoping
    235 Monitoring
    238 SEPA/Model Toxic Control Act integration
    253 SEPA lead agency for MTCA actions
    256 Preliminary evaluation
    259 Determination of nonsignificance for MTCA remedial action
    262 Determination of significance for EIS and MTCA remedial actions
    265 Early scoping for MTCA remedial actions
    268 MTCA interim actions

     

(Ord. 2526 § 1, 2007; Ord. 2106 § 1, 1998; Ord. 971 § 2(A), 1984)